Losan Pharma – Administration
Construction of office facilities for für Losan Pharma GmbH.
Office space for approximately 180 employees, including conference facilities and a restaurant.
Our services (HOAI performance phases 1-8) Architecture, structural engineering, building services, water supply and waste water, building physics, fire protection and safety engineering.
20.600 m³ total volume
2021-2023 (period)
In the new technical plant, active agents are manufactured up to a quantity of 100 kilograms. Boehringer Ingelheim invested more than 50 million Euros in the facility for the production of newly developed pharmaceutical ingredients. In addition to the technical center, which is located in the lower 3 stories, the facility also has a laboratory level for quality control.
Our services (HOAI performance phases 1 - 8) architecture, structural engineering, building services, laboratory equipment, clean rooms, water supply and waste water, building physics
30,000 m³ (total room area)
2009 - 2014 (period)
Our services (HOAI performance phases 1 - 8 as well as field engineering) architecture, structural engineering, building services, clean rooms, fire protection
57,500 m³ (total room area)
2007 - 2010 (period)
Construction of a pharmaceutical logistics centre for for ThermoFisher Scientific. Ambient and chilled storage facilities, delivery and expedition services, packaging facilities and office provision.
Our services (HOAI performance phases 1-8) Architecture, interior architect, structural engineering, building services, water supply and waste water, building physics, fire protection and safety engineering.
74.000 m³ total volume
2017-2021 (period)
Construction of a two story production facility with 11 packaging lines, laboratories, office and logistics areas, social rooms
Our services (HOAI performance phases 1-8) Architecture, interior architecture, structural engineering, building services, water supply and waste water, building physics, fire protection
35,000m³ (total room area)
2014-2017 (period)
Construction of an industrial facility with production area, logistics, molded part storage, assembly, social rooms and QA laboratory in 2 construction sections.
Our services (HOAI Performance phases 1 - 8) Architecture, building services
Eisenbach
25,200 m³ (total room area)
New Pharma Production Facility for Altana Phama in Cork Ireland with logistic centre and office facilities.
The complex consists of tableting facilities in clean-rooms, offices, quality control laboratories, social areas with restaurant, logistic and warehouse provision with an associated power plant.
Our services (HOAI performance phase 5) architecture
Ed. Züblin AG
BRI ca. 95.000 m³